A lot needs to be done to the cabinet (sanding, new laminate, etc), so the first step was to remove everything completely.
Something interesting they did, however, was that everything (except the monitor) ran off of 220 volt power. Because of that, they installed a 110 to 220 transformer. They also had a consumer grade power amplifier installed as well.